How Long Does a Kitchen Remodel Take?

View Timelapse Video Here

 

There are a few different types of kitchen renovations and they all take different amounts of time. Because television shows are quick (pun intended) to make people feel it can happen while you are at dinner, the reality has actually resulted in more than one person getting upset with me on the phone when I told them I couldn’t do a kitchen in less than 4 weeks.

 

On the “quick” end of things, if you were changing your cabinets and appliances without moving anything that would probably take less than 4 weeks. Most kitchens we do typically involve opening an adjacent wall or adding on space to enlarge the kitchen. The time factor variables are: 

  • the age of the home
  • the size of the kitchen
  • the other spaces renovated/added and
  • the intricacy (how high end) of the finishes selected


Below is a production schedule for a project we recently completed in 10 weeks. This project involved tying 2 rooms together by removing a nonbearing wall and modifying the relationship to the family room. Enjoy the time lapse video that makes it look like it happened while the client was at dinner! :)

 

If you live locally, and are embarking on a kitchen remodel, contact us to learn more about the process!

0

Leave a comment

Copyright © 2024 · Powered by LOCALiQ